6598 Inspection campaign on factories to follow up on their compliance with quality standardsVisits : 76

6598 Inspection campaign on factories to follow up on their compliance with quality standards

Ibrahim Al-Manastri, head of the Industrial Control Department, announced that during the first half of 2019, the Authority conducted 6,000 and 598 inspection campaigns on factories to follow up on their compliance with the quality standards of products, boilers and thermal machines, as well as conducting 10 thousand and 47 specialized technical studies which included 4 thousand and 40 studies Technical expertise in the field of temporary admission and druppac, 6 thousand and 4 different technical studies and 3 studies of production requirements.