A high-level Egyptian delegation inspects the Rufiji River Dam project in TanzaniaVisits : 105

A high-level Egyptian delegation inspects the Rufiji River Dam project in Tanzania

A high-level Egyptian delegation, headed by Major General Mahmoud Nassar, head of the Central Agency for Reconstruction, and Major General Abdel Fattah El-Kharsa, Assistant Chairman of the Engineering and Projects Authority, visited Tanzania to inspect the project of the construction of the Julius Nyerere Hydroelectric Dam and Power Plant, with a capacity of 2115 MW on the Rovigi River George, Tanzania, which is being implemented by the Egyptian consortium of Arab and Swedish electric contractors, at a cost of $ 2.9 billion.