The arrival of the ninth air-conditioned train of the third metro line to the port of AlexandriaVisits : 162

The arrival of the ninth air-conditioned train of the third metro line to the port of Alexandria

Eng. Kamel Al-Wazir, Minister of Transport, announced the arrival of the ninth air-conditioned train of the subway to Alexandria Port, as part of the contract concluded with the South Korean Hyundai Rotem Company.

Comments

Add Comment
No Comments